Skip to product information
Pool Ruler 350013 Replacement Pump Lid O-Ring 2 Pack + Lubricant, Compatible with Select Pentair IntelliFlo and WhisperFlo Pumps
Rs. 1,360.00
Sale price
Rs. 1,360.00
Regular price
🛡️
Buyer Protection: Full refund if your order doesn't arrive as described.
- 350013 REPLACEMENT PUMP LID O-RING Pool Ruler 350013 O-rings are replacement seals for pump lids designed to use the 350013 O-ring. Includes two O-rings plus lubricant.
- COMPATIBLE WITH SELECT PENTAIR PUMPS Designed for select IntelliFlo, IntelliFlo VSF, IntelliFlo VS+SVRS, IntelliPro, WhisperFlo, Challenger, Pinnacle, EQ-Series and Waterfall pump applications that use the 350013 lid O-ring. Compatibility varies by pump model and lid.
- CHECK THE SIZE BEFORE ORDERING Approximate O-ring dimensions are just under 6-1/2 inches across with a 1/4-inch cross section. Compare your existing O-ring and pump lid before ordering if you are unsure which seal you need.
- CHECK THE SIZE BEFORE ORDERING Approximate O-ring dimensions are just under 6-1/2 inches across with a 1/4-inch cross section. Compare your existing O-ring and pump lid before ordering if you are unsure which seal you need.
- 2-PACK WITH LUBRICANT Includes two replacement lid O-rings and lubricant for installation. Backed by Pool Ruler's one-year replacement warranty.